TY - GEN AU - F. Lalaurette AU - Jean-Raymond Bidlot AU - Laura Ferranti AU - A Ghelli AU - F. Grazzini AU - Martin Leutbecher AU - J-E. Paulsen AU - P. Viterbo AB - This document presents recent verification statistics and evaluation of ECMWF forecasts. Recent changes to the data assimilation / forecasting and post-processing system are summarised in Section 2. Verification results of the medium range free atmosphere ECMWF forecasts are presented in Section 2, including, when available, a comparison of our forecast performance with other global forecasting centres. Section 3 deals with the verification of ECMWF weather parameters and oceanic wave forecasts. Section 4 has been added this year to describe two "severe weather" studies - one on the forecast performance when dealing with weather patterns associated with severe floods over the southern alpine region, and the other on tropical cyclone forecast accuracy. Finally, Section 5 provides insights into the performance of the seasonal forecast systems. A short technical note describing the scores used in this report is given in Annex A. BT - ECMWF Technical Memoranda CY - Shinfield Park, Reading DA - 05/2005 DO - 10.21957/g29m7s50 LA - eng M1 - 463 N2 - This document presents recent verification statistics and evaluation of ECMWF forecasts. Recent changes to the data assimilation / forecasting and post-processing system are summarised in Section 2. Verification results of the medium range free atmosphere ECMWF forecasts are presented in Section 2, including, when available, a comparison of our forecast performance with other global forecasting centres. Section 3 deals with the verification of ECMWF weather parameters and oceanic wave forecasts. Section 4 has been added this year to describe two "severe weather" studies - one on the forecast performance when dealing with weather patterns associated with severe floods over the southern alpine region, and the other on tropical cyclone forecast accuracy. Finally, Section 5 provides insights into the performance of the seasonal forecast systems. A short technical note describing the scores used in this report is given in Annex A. PB - ECMWF PP - Shinfield Park, Reading PY - 2005 EP - 46 T2 - ECMWF Technical Memoranda TI - Verification statistics and evaluations of ECMWF forecasts in 2003-2004. UR - https://www.ecmwf.int/node/10633 ER -